Mizo Group
← Construction Design

Price library

Your unit rates per BOQ item, in your company's currency. A concept study or BOQ priced at a finish grade takes that grade's rate, then the Any grade rate (use it for items finishes don't change, like concrete and steel), then the mapping rule's own rate. An item with none of these stays unpriced and is counted as such — Mizo never fills in a guess.

0 of 31 BOQ items have at least one rate.

ItemDescriptionUnitAny gradeEconomyPremiumLuxuryNote
1.1Bulk excavation and disposalm3
1.2Raft foundation, concrete C40m3
1.3Basement walls and slabs, concrete C40m3
2.1Suspended slabs, concrete C40m3
2.2Columns and core walls, concrete C50m3
2.3Reinforcement B500, supplied, cut, bent and fixedt
2.4Formwork to concretem2
3.1External blockwork 200 mmm2
3.2Aluminium windows and glazing, double-glazedm2
3.3Roof waterproofing and insulationm2
3.4Unitised curtain wall glazingm2
3.5Natural stone cladding and finsm2
3.6Retail shopfronts, aluminium and glassm2
3.7Atrium bridges with glass balustradesm2
4.1Internal blockwork 100 mmm2
4.2Gypsum plaster to walls and ceilingsm2
4.3Porcelain floor tilingm2
5.1Internal and stair doors, completenr
6.1Passenger lifts, supplied and installednr
7.1MEP fit-out per apartmentnr
7.2Sanitary sets (WC, basin, shower/bath)nr
7.3Building services (HVAC, electrical, fire, plumbing) per m2 GFAm2
8.1Swimming pool excavation and disposalm3
8.2Swimming pool shell, water-retaining concrete C35m3
8.3Swimming pool reinforcement B500t
8.4Pool waterproofing membrane and mosaic tilingm2
8.5Pool deck pavingm2
8.6Pool filtration, pumps and plant room, completenr
8.7Gym fit-out and equipmentm2
8.8Soft landscaping, planting and irrigationm2
8.9Hard landscaping and external pavingm2

Add a rate for another item code

Import a price sheet

.xlsx or .csv with an Item code column and any of Any grade, Economy, Premium, Luxury columns — or Item code, Grade, Rate rows. Only cells with a number are written; blank cells leave your rates as they are.